Hyundai Electric Vehicle Plant

Specialized roof deck project for the newest Hyundai Electric Vehicle Plant, where 1.5B Roof Deck 18 GA Galvanized Primed Grade 37 (519,750 sqft), and 2.5 Composite Deck 18 GA Galvanized Primed Grade 37 (752,850 sqft) for the mezzanine were installed.

Client

SYS-CON LLC

Last update

August 23, 2023

Location

Savannah, Georgia

Size/Tonnage

1,300,000 SQFT
Scroll to read more about this project
Hyundai Electric Vehicle Plant

Project Description

The Hyundai Electric Vehicle Plant is currently in progress. Faber by Kalisch was contracted to install 1,300,000 square feet of 1.5B Roof Deck 18 GA Galvanized Primed Grade 37 (519,750 square feet) and 2.5 Composite Deck 18 GA Galvanized Primed Grade 37 (752,850 square feet) at Savannah, Georgia.

The 1.5B Roof Deck is a structural steel roof deck system that is designed to provide superior strength and durability. It is made from 18 gauge galvanized steel and is pre-primed with a rust-resistant coating. This solution will be used on the roof specifically. The 2.5 Composite Deck is a lightweight and durable deck system that is also pre-primed with a rust-resistant coating, will be used to give support to the mezzanine inside the building. These types of steel decks follow all the safety and quality guidelines established by the Steel Deck Institute (SDI).

The combination of the right planning, execution and expertise in structural solutions will give this building guaranteed reliability from floor to ceiling while reaching all the expectations of times and quality in our roof deck install in this project.

Photos of updates on this project coming soon.